Immersive Studio 7 During Construction
Vibration & mechanical isolation design (floating rooms, floors, and HVAC Acoustical coordination
Structured cabling/one wire solutions
Conduit, Cable Tray, and Cable Raceway Design
(Including calculations taking into account the equipment design requirements)
Equipment location planning
ADAAG compliance planning
Security access and interrupts
Power load calculations (based on actual equipment used & future needs)
Technical equipment HVAC requirements
Technical equipment power distribution design
Technical equipment lighting design
Television and videoconferencing lighting design
Floorbox, rack panel, and wall panel design
Digital network design
Telecommunications and IT cable routing/patching/access for buildings
Cable path routing designs